Dubai PR Network, Online Press Release from Dubai and Middle East
 
Aviation, Airline & Aerospace(Travel & Tourism)
Filter PR by
  
Emirates Engineering reconfigures second Boeing 777-200LR aircraft
 
Emirates Engineering reconfigures second Boeing 777-200LR aircraft

Dubai, UAE, 05 July 2018-   Emirates Engineering has successfully completed the reconfiguration of the second Boeing 777-200LR aircraft in its fleet. The conversion of the aircraft from three to two cabin classes was executed fully in-house at the Emirates Engineering hangars in Dubai. The reconfigured aircraft also features new, wider Business class seats in a 2-2-2 format, a new social area in business class, as well as a fully refreshed Economy class providing customers a superior inflight experience.

The first reconfigured Emirates Boeing 777-200LR aircraft took to the skies in early March 2018. The eight remaining Boeing 777-200LR aircraft in Emirates’ fleet will be progressively reconfigured by mid-2019 and deployed to a number of other cities on the airline’s global network including Santiago, Chile- Emirates' latest destination in South America. Emirates has invested over US$150 million to reconfigure the Boeing 777-200LR aircraft in its fleet.

Working with internal stakeholders as well as external suppliers, it only took Emirates Engineering 22 months from the time the decision was made to reconfigure the airline’s Boeing 777-200LR fleet to the first reconfigured aircraft rolling out of the hangars ready for its first commercial flight.

Emirates Engineering undertook a complex process to ensure that the job was completed successfully and on time. This included detailed work to outline specifications, review designs and layout, manage procurement and contracts with suppliers, secure regulatory approvals, maintain a stock of raw materials, and the management of workflows, timelines and resources in the run up to grounding the aircraft and converting the interiors.

Design and workflow

Finalising the design was core to the reconfiguration process and the layout of the cabin that was finally chosen was one of eight proposed blueprints. The engineering team also had to secure approvals from regulatory authorities including the GCAA and the FAA in order to modify the aircraft from its original design.

Once the design was finalised Emirates Engineering worked with suppliers to ensure that all the necessary parts and spares were available to complete the reconfiguration of the aircraft. In total, the team had to work with over 30 suppliers and had to manage more than 2,700 parts and spares at any one point of time. Key suppliers such as Boeing, Jamco, Panasonic, Rockwell Collins, Zodiac, and ATG were present on-site to provide assistance.

Grounding the aircraft

The next step in the process was to ground the aircraft for cabin reconfiguration. During this time the original interiors of the aircraft cabin were completely stripped and rebuilt. The reconfiguration not only involved the installation of new seats but also a number of other changes including new wiring for the lighting systems, raising the ceiling height in the business class cabin, and modifying the aircraft galleys to incorporate the new social space in business class.

It took Emirates Engineering 55 days of ground time to reconfigure the first aircraft. However, as a result of the learnings and efficiencies achieved during the first conversion, the reconfiguration of the second aircraft was completed in just 35 days.

Safety Testing

A battery of tests had to be conducted on the aircraft at various stages to ensure its safe operations. The four major types that had to be conducted included: prototype testing where the design was validated for regulatory compliance; functional testing of cabin components; EMI Electro-magnetic interference (EMI) and air-flow testing inside the cabin, and a five hour test flight with the simulation of various flight scenarios and in-flight fire and smoke testing.  

Overall, the Emirates Engineering team invested the equivalent of over 16,000 collective man hours in the design and implementation of this aircraft reconfiguration project.

Emirates Engineering operates modern and extensive technical facilities in Dubai to maintain its fleet of over 260 aircraft. Spread over 136 acres, the support infrastructure includes seven heavy maintenance hangars and four light maintenance hangars, all of which are capable of servicing the Airbus A380, the world’s largest passenger jet. Leveraging on its experience as the world’s largest operator of the Airbus A380 and the Boeing 777 aircraft, Emirates Engineering provides Maintenance, Repair and Overhaul (MRO) services selectively to external parties.


Posted by : Dubai PR Network Editorial Team
Viewed 4429 times
PR Category : Travel & Tourism
Posted on : Thursday, July 5, 2018  11:16:00 AM UAE local time (GMT+4)
Replication or redistribution in whole or in part is expressly prohibited without the prior written consent of DubaiPRNetwork.com.
Previous Story : Turkish Airlines signed a significant global agreement with ...
Next Story : Airbus to reveal winners of the second edition of ‘Entaliq i...
Email this article Print this article

Share this article with your friends and followers
NewsVine
Back to Section Home

Related Stories



 
 
Most Viewed Press Release posted in the last 7 days
Global brands with lowest cost at Karama Ware house sale from this Thursday [29439-Views]
Glam's Makeup Launches in the Middle East [16189-Views]
Review: Facial with Dr Renaud's range at Nazih [15866-Views]
CFB T3 000 Manufacture Movement Pioneering Peripheral Technology [14866-Views]
Glasshouse Collection from Olivia Burton [14585-Views]
CALVIN KLEIN WOMEN: The first CALVIN KLEIN fragrance developed under the vision of Chief... [14512-Views]
Anivagene Launches in the UAE [14103-Views]
Mr. Burberry Indigo Eau De Toilette [12895-Views]
Hour Choice presents Coach New York Collection [12261-Views]
Prevention, Not Cure: Kaya's ‘Hair Strength Therapies' Set to Rid the Gulf of its Hair Pro... [11999-Views]
Tommy Hilfiger Iconic Sport collection [11035-Views]
Matthew Fitzpatrick Wins the 2018 Omega European Masters [10718-Views]
Executive Tourbillon Free Wheel [10632-Views]
Introducing New Make-up From Rodial That You Need In Your Kit [10022-Views]
Australia's Number No.1 Natural Skincare Brand* Partners With Jessica Kahawaty [9595-Views]
Rado reimagines a bold 1960s classic for the 21st Century [8266-Views]
Scuderia Ferrari presents Fall winter collection [8150-Views]
Kate Spade New York Presents Debut Collection From Creative Director Nicola Glass at the ... [7058-Views]
Introducing VK Beauty Lounge & Bar [6295-Views]
Tata Communications Strengthens Cyber Defence in the Middle East with the Launch of its Cy... [6228-Views]
Samsung Launches the New Galaxy Watch in the UAE [6222-Views]
Rolls-Royce Motor Cars Takes the Luxury of Privacy to a New Level [6118-Views]
Facebook Launches Community Help on Facebook Lite [6082-Views]
Dubai Culture Organises ‘Writing Literature Novels and Editing them as Play Scripts' as pa... [5710-Views]
Alina Anwar Couture Launches in UAE [5655-Views]
 
RSS Facebook Twitter LinkedDin
 
Top Sections
 
Top Stories