Dubai PR Network, Online Press Release from Dubai and Middle East
 
(Energy and Industry)
Filter PR by
  
Schneider Electric Adds New Features and PROFIBUS and PROFINET Compatibility to TeSys™ island Digital Load Management System
 
• Application avatars set new ease-of-use standards for pump and conveyor environments. 
• PROFIBUS and PROFINET protocol support now added to existing Ethernet/IP and Modbus TCP compatibility for a wider range of applications.
• Flexible load management now allows for autonomous operation mode.
 
Schneider Electric, the global specialist in energy management and automation, today announced important additions to its versatile TeSys™ island digital load management system solution.
When introduced, TeSys island redefined the way loads are managed and introduced unprecedented potential for efficiency in machine design, installation and service phases. TeSys island is a fully digitized and object-oriented load management system and an Industry 4.0 compliant data provider. With the availability of advanced power and diagnostic data, it is improving load performance and control while limiting downtime. The efficient modular/scalable TeSys island design translates into OEM assembly savings due to drastically reduced wiring, integration savings because of easy connectivity in mixed vendor environments, maintenance savings since remote maintenance is now possible. End users benefit from a rich suite of functions that drive operational efficiencies. Also, users and OEMs now have the benefit of predictive maintenance to help reduce downtime.
 
Motor control ease of use 
TeSys island application avatars, which are now added to the existing library of function-based avatars, are digital objects with pre-programmed functionality integrated. The two new configurable application avatars, one for pumping applications and one for conveyor applications, are designed to ensure easy integration into existing system infrastructures, through connection to the TeSys island bus coupler and I/O modules. Control modes can be chosen by the user to be either remote (PLC driven), autonomous (process variable driven) or local (operator driven).
 
Application avatar features enable flexible operation of the TeSys island digital load management system in a number of new ways:
• Autonomous control mode - The Autonomous mode enables TeSys island to control loads independently from the PLC. The TeSys avatar logic monitors values coming from sensors (i.e., pressure, flow) and matches the preset thresholds to make sure the load is operating in an optimized fashion. For example, with this mode, the application can continuously run even if the connection to the PLC is not available.  
 
• Predictive alarms - The TeSys island system can now generate alarms and alerts an impending failure before a failure occurs at the load level, thereby reducing instances of downtime. Predictive alarms are triggered by a combination of protection function alarms (generated from sensor values such as temperature or liquid viscosity) and application process variable input conditions (like the liquid level and flow pressure in a pump). For example, the system can combine those two warnings and indicate that there is a high chance of a pump running dry unless corrective actions are taken.
 
Additional communication protocols, protection enhancements, and enriched diagnostics
In addition to current references that enable communications within EtherNet/IP and Modbus-TCP environments, TeSys island is now available with PROFIBUS and PROFINET compatibility. In addition, the predictive maintenance avatars are dedicated to protection. Advanced diagnostics also help to detect the failure of an internal device within the control panel or failure of a connected load. 
 
TIA (Totally Integrated Automation) Portal integration
TeSys island now operates as a native device in the TIA portal. A TeSys island configuration defined at the SoMove configuration tool can be imported via an AML file interface. Also, a library of function blocks is available to be used within the TIA portal. As a result, OEMs and end users do not need to spend time programming and developing libraries, which helps to reduce engineering 
These new features have earned TeSys island third place in the Automation category award of SPS Nürnberg in 2019.


Posted by : Dubai PR Network Editorial Team
Viewed 5886 times
PR Category : Energy and Industry
Posted on : Sunday, February 16, 2020  6:21:00 PM UAE local time (GMT+4)
Replication or redistribution in whole or in part is expressly prohibited without the prior written consent of DubaiPRNetwork.com.
Previous Story : FANR Issues Operating License for Unit 1 of Barakah Nuclear ...
Next Story : Abu Dhabi Power Corporation Announces the Establishment of t...
Email this article Print this article

Share this article with your friends and followers
NewsVine
Back to Section Home

Related Stories



 
 
Most Viewed Press Release posted in the last 7 days
Lamborghini SCV12: Squadra Corse Hypercar Ready to Hit the Track [4736-Views]
Let's Brigthen Up! The Face Shop's Ultimate Summer Skincare Range From Belif is Here! [3813-Views]
NUDESTIX Launches - Nudies Blush, Bronze, and Glow Shade Extension [3624-Views]
Saxo Bank Launches Loyalty Program for MENA Region Clients [3620-Views]
WTTC Launches Safe Travels Protocols for Attractions, Car Hire and Short-Term Rental [3423-Views]
Dabur Launches Pure Organic Coconut Oil: Natural Protection for Hair, Skin, and Overall He... [3259-Views]
Crude Oil Headwinds on Virus and Technicals [2940-Views]
Registration Opens for Training On the Camel Trek and Camel Marathon for Expats [2841-Views]
Essence Spring/Summer 2020 Collection [2562-Views]
Pan Emirates Unveils Exclusive New Collection [2435-Views]
Dubai Sports Council Discuss Upcoming Sports Events With Federations and Organisers [2411-Views]
Big Bang Integral King Gold [2386-Views]
Customers can Benefit from Increasing Gold Rate by just Paying 10% Advance at Malabar Gold... [2325-Views]
IATA Proposes Alternatives to Quarantine' [2218-Views]
IATA Proposes Alternatives to Quarantine [2206-Views]
Preparing for a New Post-pandemic Economic Era in Mena [2161-Views]
Siemens Energy signs Al Hamudhia 400kV Substation contract with Iraqi Ministry of Electric... [2157-Views]
The 11th Edition of the Arab Fashion Week to Launch Virtually Today, from June 24th to 26t... [2140-Views]
New Bentayga to Launch Beyond100 [2050-Views]
Transfast Partners with Habib Bank Limited (HBL) for Global Remittances [2021-Views]
Frontline Warriors and Volunteers from two Al Warsan isolation facilities honoured for hel... [1976-Views]
Cairo Amman Bank Adopts the Latest Technology to Enhance Performance and Security for its ... [1939-Views]
Panasonic Jaguar Racing Management Team Discuss Formula E's Return to Racing in Berlin [1931-Views]
Formula 1 Launches #WeRaceAsOne [1915-Views]
Media Rotana Hotel Reopens Its Doors With Attractive Offers in a Safe Environment [1898-Views]
 
RSS Facebook Twitter LinkedDin
 
Top Sections
 
Top Stories